Wednesday, May 28, 2008

Yummy!

Sliders

The main floor sliders are being installed.

Reveal Detail

We have put tremendous effort into the details in these homes as can
be seen by the the reveal detail between the window casings and the
drywall. This will also carry through the homes above all the
baseboards.

Tuesday, May 27, 2008

Front Entrances

We poured the front entrances today.

Drywall!

The drywall board men are working away.

Monday, May 26, 2008

Preparing front entrances for pouring

The front stairs have been formed and the rebar has been placed. We
are just waiting for the concrete to be poured.

Tapping into the main gas line

Did you know that the gas is not shut off when connecting a new line?
Very interesting, isn't it?

Gas

The gas lines are being installed today.

Thursday, May 22, 2008

Nice trench drain!

So much thought has gone into the details and finishings in these
homes. This is the drain in the shower in the master bathroom.

Tuesday, May 20, 2008

Bricks nearing completion

Soldier courses take time but we feel they look incredible.

Thursday, May 15, 2008

Getting ready for drywall.

The insulators are here and moving along quickly. We should be
boarding with drywall soon.

Tuesday, May 6, 2008

Pouring the Basements

The basement slabs are being poured today.

Bricks are halfway done

91A's brickwork has neared completion and it looks incredible.